Disaster recovery plans that have never been tested are, in practice, untested assumptions — and the gap between assumption and reality tends to surface at the worst possible time.
There is a quiet shift happening in how organisations think about where their infrastructure lives. What was once a purely technical decision now sits squarely on the boardroom agenda, and for good reason.
Planning for what comes next
Geography is strategy. Where your data physically sits affects latency, sovereignty, and resilience. Spreading critical workloads across regions is no longer just for the largest enterprises.
Term length is a lever worth pulling thoughtfully. Longer commitments unlock materially better rates and, increasingly, priority access to scarce capacity — but only commit ahead if you are confident in the trajectory.
Why it matters now
Power has overtaken floor space as the binding constraint in most primary markets. Vacancy rates have fallen to record lows, and the practical effect is that capacity — particularly high-density capacity — increasingly needs to be reserved well ahead of when you actually need it.
The market has split in two. Standard enterprise workloads still run comfortably at three to five kilowatts a rack, while accelerated-compute deployments are pushing twenty, fifty, even a hundred kilowatts. Those two worlds are priced and provisioned very differently, and conflating them is a common and expensive mistake.
The factors that actually move the needle
Headline pricing is the least reliable basis for comparison. Two facilities quoting similar rates can differ enormously once you account for power redundancy, cross-connect fees, remote-hands rates, and the small print around escalations and renewals.
Connectivity richness is frequently underweighted. A carrier-neutral facility with a dense ecosystem of networks and direct cloud on-ramps can save more over a contract term than a modest difference in the rack rate ever will.
A practical way to evaluate
Start with requirements, not providers. Pin down your power per rack, total committed capacity, connectivity needs, and the compliance regimes you answer to. That single page of clarity will shape every conversation that follows.
Model the whole cost, not the monthly line. Setup fees, cross-connects, bandwidth, growth headroom, and exit terms all belong in the comparison. The cheapest rack rate is rarely the cheapest deployment.
A short checklist before you sign
- Leave headroom for growth, including higher-density racks down the line
- Total the full cost of ownership, including the fees that hide in the small print
- Ask for real uptime history, not just the design tier
- Map the network ecosystem: carriers, internet exchanges, and cloud on-ramps
- Confirm the certifications your industry and customers actually require
The bottom line
The teams that get this right are rarely the ones with the most resources — they are the ones who asked better questions earlier in the process.
