Tier III
Request a Quote
Aligned HON110 Hong Kong
Aligned Β· π Hong Kong, Hong Kong
Overview
Aligned HON110 Hong Kong is a Tier III carrier-neutral colocation facility operated by Aligned in Hong Kong, Hong Kong, offering approximately 35 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.
Facility Specifications
Tier Classification
Tier III
Total Power
35 MW
Total Space
15500 sqm
Year Established
2019
Cooling
Evaporative / adiabatic cooling
Connectivity
Carrier-neutral, Dark fibre available
Certifications & Compliance
βGDPRβUptime Institute Tier IIIβISO 50001βISO 27001βUptime Institute Tier IV
Network Carriers
Representative of the carrier ecosystem typically available at this facility β confirm current carriers on-site with the operator.
Tata Communications
PCCW Global
SingTel
Location
π‘ Nearby subsea cable infrastructure
This facility is approximately 8 km from the Hong Kong, Hong Kong cable landing point, which serves APG, FASTER, SJC, TPE. Proximity to a landing station can be a factor in latency and diversity planning β confirm specific connectivity with the facility operator.
View all landing points βAL
Aligned
View provider profile β RegionAsia
TierTier III
Power35 MW