Tier III

Bulk Infrastructure ACC34 Accra

Bulk Infrastructure Β· πŸ“ Accra, Ghana

πŸ“‘ Near a subsea cable landing point β€” Accra (10 km)

Request a Quote

Overview

Bulk Infrastructure ACC34 Accra is a Tier III carrier-neutral colocation facility operated by Bulk Infrastructure in Accra, Ghana, offering approximately 19 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
19 MW
Total Space
17500 sqm
Year Established
2021
Cooling
Chilled water with free cooling
Connectivity
40+ carriers, 40+ carriers

Certifications & Compliance

βœ“ISO 50001βœ“ISO 27001βœ“Uptime Institute Tier IVβœ“PCI DSS

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

MTN Global Connect Safaricom MainOne

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 10 km from the Accra, Ghana cable landing point, which serves ACE, WACS, MainOne. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
BU
Bulk Infrastructure
View provider profile β†’
RegionAfrica
TierTier III
Power19 MW
Get a Quote Contact Provider

More from Bulk Infrastructure

BU

Bulk N01 Oslo

Bulk Infrastructure
Tier III
Oslo, Norway
Power20 MW
Space160,000 sq ft
Carriers15+ carriers
ISO 27001 SOC 2
BU

Bulk DK01 Esbjerg

Bulk Infrastructure
Tier III
Esbjerg, Denmark
Power20 MW
Space120,000 sq ft
Carriers18+ carriers
Uptime Tier III ISO 27001
BU

Bulk Infrastructure ASH10 Ashburn

Bulk Infrastructure
Tier IV
Ashburn, United States
Power139 MW
Space5500 sqm
Carriers40+ carriers, 40+ carriers
GDPR Uptime Institute Tier III ISO 50001