Tier III

Bulk Infrastructure CAI104 Cairo

Bulk Infrastructure Β· πŸ“ Cairo, Egypt

Request a Quote

Overview

Bulk Infrastructure CAI104 Cairo is a Tier III carrier-neutral colocation facility operated by Bulk Infrastructure in Cairo, Egypt, offering approximately 49 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
49 MW
Total Space
12500 sqm
Year Established
2006
Cooling
Chilled water with free cooling
Connectivity
20+ carriers, Cloud on-ramps (AWS/Azure/GCP)

Certifications & Compliance

βœ“ISO 50001βœ“ISO 27001βœ“Uptime Institute Tier IVβœ“PCI DSS

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

Airtel Africa Orange Africa Liquid Intelligent Technologies MTN Global Connect

Location

BU
Bulk Infrastructure
View provider profile β†’
RegionAfrica
TierTier III
Power49 MW
Get a Quote Contact Provider

More from Bulk Infrastructure

BU

Bulk N01 Oslo

Bulk Infrastructure
Tier III
Oslo, Norway
Power20 MW
Space160,000 sq ft
Carriers15+ carriers
ISO 27001 SOC 2
BU

Bulk DK01 Esbjerg

Bulk Infrastructure
Tier III
Esbjerg, Denmark
Power20 MW
Space120,000 sq ft
Carriers18+ carriers
Uptime Tier III ISO 27001
BU

Bulk Infrastructure ASH10 Ashburn

Bulk Infrastructure
Tier IV
Ashburn, United States
Power139 MW
Space5500 sqm
Carriers40+ carriers, 40+ carriers
GDPR Uptime Institute Tier III ISO 50001