Tier III

Bulk Infrastructure MIA95 Miami

Bulk Infrastructure Β· πŸ“ Miami, United States

πŸ“‘ Near a subsea cable landing point β€” Miami (2 km)

Request a Quote

Overview

Bulk Infrastructure MIA95 Miami is a Tier III carrier-neutral colocation facility operated by Bulk Infrastructure in Miami, United States, offering approximately 40 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
40 MW
Total Space
8000 sqm
Year Established
2015
Cooling
Direct-to-chip liquid cooling
Connectivity
Cloud on-ramps (AWS/Azure/GCP), 40+ carriers

Certifications & Compliance

βœ“PCI DSSβœ“ISO 22301βœ“HIPAAβœ“SOC 2 Type II

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

Verizon Business GTT Cogent Communications

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 2 km from the Miami, United States cable landing point, which serves Americas-II, ARCOS, Maya-1, SAm-1. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
BU
Bulk Infrastructure
View provider profile β†’
RegionNorth America
TierTier III
Power40 MW
Get a Quote Contact Provider

More from Bulk Infrastructure

BU

Bulk N01 Oslo

Bulk Infrastructure
Tier III
Oslo, Norway
Power20 MW
Space160,000 sq ft
Carriers15+ carriers
ISO 27001 SOC 2
BU

Bulk DK01 Esbjerg

Bulk Infrastructure
Tier III
Esbjerg, Denmark
Power20 MW
Space120,000 sq ft
Carriers18+ carriers
Uptime Tier III ISO 27001
BU

Bulk Infrastructure ASH10 Ashburn

Bulk Infrastructure
Tier IV
Ashburn, United States
Power139 MW
Space5500 sqm
Carriers40+ carriers, 40+ carriers
GDPR Uptime Institute Tier III ISO 50001