Tier III

CyrusOne MAN117 Manila

CyrusOne Β· πŸ“ Manila, Philippines

πŸ“‘ Near a subsea cable landing point β€” Batangas (103 km)

Request a Quote

Overview

CyrusOne MAN117 Manila is a Tier III carrier-neutral colocation facility operated by CyrusOne in Manila, Philippines, offering approximately 42 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
42 MW
Total Space
19000 sqm
Year Established
2011
Cooling
Air-cooled (CRAC/CRAH)
Connectivity
Subsea cable access, Dark fibre available

Certifications & Compliance

βœ“Uptime Institute Tier IIIβœ“ISO 50001βœ“ISO 27001

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

PCCW Global SingTel China Telecom Global KT Corporation Bharti Airtel

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 103 km from the Batangas, Philippines cable landing point, which serves Asia America Gateway (AAG), TGN-IA. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
RegionAsia
TierTier III
Power42 MW
Get a Quote Contact Provider

More from CyrusOne

CY

CyrusOne Chicago Aurora

CyrusOne
Tier III
Aurora, United States
Power96 MW
Space428,000 sq ft
Carriers104+ carriers
SOC 2 ISO 27001 PCI DSS
CY

CyrusOne Dallas Carrollton

CyrusOne
Tier IV
Carrollton, United States
Power120 MW
Space670,000 sq ft
Carriers51+ carriers
Uptime Tier IV SOC 2 ISO 27001
CY

CyrusOne Phoenix

CyrusOne
Tier III
Chandler, United States
Power108 MW
Space550,000 sq ft
Carriers33+ carriers
SOC 2 ISO 27001 PCI DSS