Tier III

Green Mountain DUB123 Dubai

Green Mountain Β· πŸ“ Dubai, United Arab Emirates

πŸ“‘ Near a subsea cable landing point β€” Fujairah (112 km)

Request a Quote

Overview

Green Mountain DUB123 Dubai is a Tier III carrier-neutral colocation facility operated by Green Mountain in Dubai, United Arab Emirates, offering approximately 28 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
28 MW
Total Space
2000 sqm
Year Established
2009
Cooling
Direct-to-chip liquid cooling
Connectivity
Internet exchange on-site, Internet exchange on-site

Certifications & Compliance

βœ“ISO 9001βœ“GDPRβœ“Uptime Institute Tier IIIβœ“ISO 50001

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

PCCW Global SingTel China Telecom Global KT Corporation

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 112 km from the Fujairah, United Arab Emirates cable landing point, which serves FALCON, SEA-ME-WE 5, Africa-1. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
GR
RegionAsia
TierTier III
Power28 MW
Get a Quote Contact Provider

More from Green Mountain

GR

Green Mountain DC1 Stavanger

Green Mountain
Tier III
Stavanger, Norway
Power35 MW
Space240,000 sq ft
Carriers39+ carriers
ISO 27001 SOC 2 ISO 14001
GR

Green Mountain OSL1 Rjukan

Green Mountain
Tier III
Oslo, Norway
Power22 MW
Space130,000 sq ft
Carriers16+ carriers
Uptime Tier III ISO 27001 ISO 50001
GR

Green Mountain ASH14 Ashburn

Green Mountain
Tier III
Ashburn, United States
Power39 MW
Space7500 sqm
Carriers40+ carriers, 40+ carriers
ISO 50001 ISO 27001 Uptime Institute Tier IV