Tier III

Green Mountain LAG34 Lagos

Green Mountain Β· πŸ“ Lagos, Nigeria

πŸ“‘ Near a subsea cable landing point β€” Lagos (5 km)

Request a Quote

Overview

Green Mountain LAG34 Lagos is a Tier III carrier-neutral colocation facility operated by Green Mountain in Lagos, Nigeria, offering approximately 19 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
19 MW
Total Space
17500 sqm
Year Established
2015
Cooling
Chilled water with free cooling
Connectivity
Cloud on-ramps (AWS/Azure/GCP), Internet exchange on-site

Certifications & Compliance

βœ“ISO 50001βœ“ISO 27001βœ“Uptime Institute Tier IVβœ“PCI DSS

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

MainOne Teraco Network Partners Airtel Africa Orange Africa Liquid Intelligent Technologies

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 5 km from the Lagos, Nigeria cable landing point, which serves WACS, ACE, MainOne, Glo-1, 2Africa. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
GR
RegionAfrica
TierTier III
Power19 MW
Get a Quote Contact Provider

More from Green Mountain

GR

Green Mountain DC1 Stavanger

Green Mountain
Tier III
Stavanger, Norway
Power35 MW
Space240,000 sq ft
Carriers39+ carriers
ISO 27001 SOC 2 ISO 14001
GR

Green Mountain OSL1 Rjukan

Green Mountain
Tier III
Oslo, Norway
Power22 MW
Space130,000 sq ft
Carriers16+ carriers
Uptime Tier III ISO 27001 ISO 50001
GR

Green Mountain ASH14 Ashburn

Green Mountain
Tier III
Ashburn, United States
Power39 MW
Space7500 sqm
Carriers40+ carriers, 40+ carriers
ISO 50001 ISO 27001 Uptime Institute Tier IV