Tier II

Green Mountain LIS106 Lisbon

Green Mountain Β· πŸ“ Lisbon, Portugal

πŸ“‘ Near a subsea cable landing point β€” Lisbon (5 km)

Request a Quote

Overview

Green Mountain LIS106 Lisbon is a Tier II carrier-neutral colocation facility operated by Green Mountain in Lisbon, Portugal, offering approximately 7 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier II
Total Power
7 MW
Total Space
13500 sqm
Year Established
2007
Cooling
Evaporative / adiabatic cooling
Connectivity
40+ carriers, 40+ carriers

Certifications & Compliance

βœ“SOC 2 Type IIβœ“ISO 9001βœ“GDPRβœ“Uptime Institute Tier IIIβœ“ISO 50001

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

Vodafone Telia Carrier Colt Technology Services

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 5 km from the Lisbon, Portugal cable landing point, which serves EllaLink, Columbus, TAT-14. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
GR
RegionEurope
TierTier II
Power7 MW
Get a Quote Contact Provider

More from Green Mountain

GR

Green Mountain DC1 Stavanger

Green Mountain
Tier III
Stavanger, Norway
Power35 MW
Space240,000 sq ft
Carriers39+ carriers
ISO 27001 SOC 2 ISO 14001
GR

Green Mountain OSL1 Rjukan

Green Mountain
Tier III
Oslo, Norway
Power22 MW
Space130,000 sq ft
Carriers16+ carriers
Uptime Tier III ISO 27001 ISO 50001
GR

Green Mountain ASH14 Ashburn

Green Mountain
Tier III
Ashburn, United States
Power39 MW
Space7500 sqm
Carriers40+ carriers, 40+ carriers
ISO 50001 ISO 27001 Uptime Institute Tier IV