Tier II

Green Mountain MAN128 Manila

Green Mountain Β· πŸ“ Manila, Philippines

πŸ“‘ Near a subsea cable landing point β€” Batangas (100 km)

Request a Quote

Overview

Green Mountain MAN128 Manila is a Tier II carrier-neutral colocation facility operated by Green Mountain in Manila, Philippines, offering approximately 9 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier II
Total Power
9 MW
Total Space
4500 sqm
Year Established
2023
Cooling
Rear-door heat exchangers
Connectivity
Internet exchange on-site, 40+ carriers

Certifications & Compliance

βœ“Uptime Institute Tier IVβœ“PCI DSSβœ“ISO 22301

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

China Telecom Global KT Corporation Bharti Airtel

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 100 km from the Batangas, Philippines cable landing point, which serves Asia America Gateway (AAG), TGN-IA. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
GR
RegionAsia
TierTier II
Power9 MW
Get a Quote Contact Provider

More from Green Mountain

GR

Green Mountain DC1 Stavanger

Green Mountain
Tier III
Stavanger, Norway
Power35 MW
Space240,000 sq ft
Carriers39+ carriers
ISO 27001 SOC 2 ISO 14001
GR

Green Mountain OSL1 Rjukan

Green Mountain
Tier III
Oslo, Norway
Power22 MW
Space130,000 sq ft
Carriers16+ carriers
Uptime Tier III ISO 27001 ISO 50001
GR

Green Mountain ASH14 Ashburn

Green Mountain
Tier III
Ashburn, United States
Power39 MW
Space7500 sqm
Carriers40+ carriers, 40+ carriers
ISO 50001 ISO 27001 Uptime Institute Tier IV