Tier III

Green Mountain MAN25 Manila

Green Mountain Β· πŸ“ Manila, Philippines

πŸ“‘ Near a subsea cable landing point β€” Batangas (102 km)

Request a Quote

Overview

Green Mountain MAN25 Manila is a Tier III carrier-neutral colocation facility operated by Green Mountain in Manila, Philippines, offering approximately 50 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
50 MW
Total Space
13000 sqm
Year Established
2007
Cooling
Hot/cold aisle containment
Connectivity
40+ carriers, Internet exchange on-site

Certifications & Compliance

βœ“PCI DSSβœ“ISO 22301βœ“HIPAAβœ“SOC 2 Type IIβœ“ISO 9001

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

PLDT NTT Communications Tata Communications PCCW Global

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 102 km from the Batangas, Philippines cable landing point, which serves Asia America Gateway (AAG), TGN-IA. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
GR
RegionAsia
TierTier III
Power50 MW
Get a Quote Contact Provider

More from Green Mountain

GR

Green Mountain DC1 Stavanger

Green Mountain
Tier III
Stavanger, Norway
Power35 MW
Space240,000 sq ft
Carriers39+ carriers
ISO 27001 SOC 2 ISO 14001
GR

Green Mountain OSL1 Rjukan

Green Mountain
Tier III
Oslo, Norway
Power22 MW
Space130,000 sq ft
Carriers16+ carriers
Uptime Tier III ISO 27001 ISO 50001
GR

Green Mountain ASH14 Ashburn

Green Mountain
Tier III
Ashburn, United States
Power39 MW
Space7500 sqm
Carriers40+ carriers, 40+ carriers
ISO 50001 ISO 27001 Uptime Institute Tier IV