Tier III

Iron Mountain LAG75 Lagos

Iron Mountain Β· πŸ“ Lagos, Nigeria

πŸ“‘ Near a subsea cable landing point β€” Lagos (13 km)

Request a Quote

Overview

Iron Mountain LAG75 Lagos is a Tier III carrier-neutral colocation facility operated by Iron Mountain in Lagos, Nigeria, offering approximately 60 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
60 MW
Total Space
18000 sqm
Year Established
2005
Cooling
Air-cooled (CRAC/CRAH)
Connectivity
Carrier-neutral, Cloud on-ramps (AWS/Azure/GCP)

Certifications & Compliance

βœ“PCI DSSβœ“ISO 22301βœ“HIPAA

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

MTN Global Connect Safaricom MainOne Teraco Network Partners Airtel Africa

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 13 km from the Lagos, Nigeria cable landing point, which serves WACS, ACE, MainOne, Glo-1, 2Africa. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
IR
RegionAfrica
TierTier III
Power60 MW
Get a Quote Contact Provider

More from Iron Mountain

IR

Iron Mountain VA-1 Manassas

Iron Mountain
Tier III
Manassas, United States
Power40 MW
Space150,000 sq ft
Carriers102+ carriers
SOC 2 ISO 27001 FedRAMP
IR

Iron Mountain AZP-1 Phoenix

Iron Mountain
Tier III
Phoenix, United States
Power48 MW
Space552,000 sq ft
Carriers62+ carriers
SOC 2 ISO 27001 HIPAA
IR

Iron Mountain WPA-1 Boyers

Iron Mountain
Tier III
Boyers, United States
Power27 MW
Space145,000 sq ft
Carriers31+ carriers
SOC 2 ISO 27001 FedRAMP