KI
KIO Networks Mexico City
KIO Networks
Mexico City, Mexico
Uptime Tier IV
ISO 27001
SOC 2
KIO Networks Β· π Cairo, Egypt
KIO Networks CAI153 Cairo is a Tier IV carrier-neutral colocation facility operated by KIO Networks in Cairo, Egypt, offering approximately 72 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.
Representative of the carrier ecosystem typically available at this facility β confirm current carriers on-site with the operator.