Tier III

MainOne ABU130 Abu Dhabi

MainOne Β· πŸ“ Abu Dhabi, United Arab Emirates

Request a Quote

Overview

MainOne ABU130 Abu Dhabi is a Tier III carrier-neutral colocation facility operated by MainOne in Abu Dhabi, United Arab Emirates, offering approximately 35 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
35 MW
Total Space
5500 sqm
Year Established
2022
Cooling
Evaporative / adiabatic cooling
Connectivity
Cloud on-ramps (AWS/Azure/GCP), Internet exchange on-site

Certifications & Compliance

βœ“GDPRβœ“Uptime Institute Tier IIIβœ“ISO 50001βœ“ISO 27001βœ“Uptime Institute Tier IV

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

KT Corporation Bharti Airtel PLDT NTT Communications Tata Communications

Location

RegionAsia
TierTier III
Power35 MW
Get a Quote Contact Provider

More from MainOne

MA

MainOne MDX-1 Lagos

MainOne
Tier III
Lagos, Nigeria
Power8 MW
Space65,000 sq ft
Carriers92+ carriers
Uptime Tier III ISO 27001
MA

MainOne MDX-i Sagamu

MainOne
Tier III
Sagamu, Nigeria
Power9 MW
Space60,000 sq ft
Carriers30+ carriers
Uptime Tier III ISO 27001
MA

MainOne ASH34 Ashburn

MainOne
Tier III
Ashburn, United States
Power39 MW
Space17500 sqm
CarriersCloud on-ramps (AWS/Azure/GCP), Internet exchange on-site
ISO 50001 ISO 27001 Uptime Institute Tier IV