Tier II

Stack Infrastructure GUA43 Guangzhou

Stack Infrastructure Β· πŸ“ Guangzhou, China

πŸ“‘ Near a subsea cable landing point β€” Hong Kong (131 km)

Request a Quote

Overview

Stack Infrastructure GUA43 Guangzhou is a Tier II carrier-neutral colocation facility operated by Stack Infrastructure in Guangzhou, China, offering approximately 4 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier II
Total Power
4 MW
Total Space
2000 sqm
Year Established
2014
Cooling
Air-cooled (CRAC/CRAH)
Connectivity
40+ carriers, Carrier-neutral

Certifications & Compliance

βœ“ISO 9001βœ“GDPRβœ“Uptime Institute Tier III

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

Bharti Airtel PLDT NTT Communications

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 131 km from the Hong Kong, Hong Kong cable landing point, which serves APG, FASTER, SJC, TPE. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
ST
Stack Infrastructure
View provider profile β†’
RegionAsia
TierTier II
Power4 MW
Get a Quote Contact Provider

More from Stack Infrastructure

ST

Stack Infrastructure Portland

Stack Infrastructure
Tier III
Hillsboro, United States
Power50 MW
Space290,000 sq ft
Carriers69+ carriers
ISO 27001 SOC 2
ST

Stack San Jose SJC

Stack Infrastructure
Tier III
San Jose, United States
Power40 MW
Space290,000 sq ft
Carriers45+ carriers
ISO 27001 SOC 2
ST

Stack Northern Virginia

Stack Infrastructure
Tier III
Ashburn, United States
Power100 MW
Space550,000 sq ft
Carriers32+ carriers
ISO 27001 SOC 2 PCI DSS