Tier III

Stack Infrastructure LAG43 Lagos

Stack Infrastructure Β· πŸ“ Lagos, Nigeria

πŸ“‘ Near a subsea cable landing point β€” Lagos (9 km)

Request a Quote

Overview

Stack Infrastructure LAG43 Lagos is a Tier III carrier-neutral colocation facility operated by Stack Infrastructure in Lagos, Nigeria, offering approximately 28 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.

Facility Specifications

Tier Classification
Tier III
Total Power
28 MW
Total Space
2000 sqm
Year Established
2024
Cooling
Direct-to-chip liquid cooling
Connectivity
Dark fibre available, Subsea cable access

Certifications & Compliance

βœ“ISO 9001βœ“GDPRβœ“Uptime Institute Tier IIIβœ“ISO 50001

Network Carriers

Representative of the carrier ecosystem typically available at this facility β€” confirm current carriers on-site with the operator.

Orange Africa Liquid Intelligent Technologies MTN Global Connect Safaricom MainOne

Location

πŸ“‘ Nearby subsea cable infrastructure

This facility is approximately 9 km from the Lagos, Nigeria cable landing point, which serves WACS, ACE, MainOne, Glo-1, 2Africa. Proximity to a landing station can be a factor in latency and diversity planning β€” confirm specific connectivity with the facility operator.

View all landing points β†’
ST
Stack Infrastructure
View provider profile β†’
RegionAfrica
TierTier III
Power28 MW
Get a Quote Contact Provider

More from Stack Infrastructure

ST

Stack Infrastructure Portland

Stack Infrastructure
Tier III
Hillsboro, United States
Power50 MW
Space290,000 sq ft
Carriers69+ carriers
ISO 27001 SOC 2
ST

Stack San Jose SJC

Stack Infrastructure
Tier III
San Jose, United States
Power40 MW
Space290,000 sq ft
Carriers45+ carriers
ISO 27001 SOC 2
ST

Stack Northern Virginia

Stack Infrastructure
Tier III
Ashburn, United States
Power100 MW
Space550,000 sq ft
Carriers32+ carriers
ISO 27001 SOC 2 PCI DSS