Tier III
Request a Quote
Stack Infrastructure LAG43 Lagos
Stack Infrastructure Β· π Lagos, Nigeria
Overview
Stack Infrastructure LAG43 Lagos is a Tier III carrier-neutral colocation facility operated by Stack Infrastructure in Lagos, Nigeria, offering approximately 28 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.
Facility Specifications
Tier Classification
Tier III
Total Power
28 MW
Total Space
2000 sqm
Year Established
2024
Cooling
Direct-to-chip liquid cooling
Connectivity
Dark fibre available, Subsea cable access
Certifications & Compliance
βISO 9001βGDPRβUptime Institute Tier IIIβISO 50001
Network Carriers
Representative of the carrier ecosystem typically available at this facility β confirm current carriers on-site with the operator.
Orange Africa
Liquid Intelligent Technologies
MTN Global Connect
Safaricom
MainOne
Location
π‘ Nearby subsea cable infrastructure
This facility is approximately 9 km from the Lagos, Nigeria cable landing point, which serves WACS, ACE, MainOne, Glo-1, 2Africa. Proximity to a landing station can be a factor in latency and diversity planning β confirm specific connectivity with the facility operator.
View all landing points βST
Stack Infrastructure
View provider profile β RegionAfrica
TierTier III
Power28 MW