Tier III
Request a Quote
Teraco MAN98 Manila
Teraco Β· π Manila, Philippines
Overview
Teraco MAN98 Manila is a Tier III carrier-neutral colocation facility operated by Teraco in Manila, Philippines, offering approximately 23 MW of IT load with resilient power and cooling, dense connectivity, and 24/7 on-site security.
Facility Specifications
Tier Classification
Tier III
Total Power
23 MW
Total Space
9500 sqm
Year Established
2022
Cooling
Evaporative / adiabatic cooling
Connectivity
Cloud on-ramps (AWS/Azure/GCP), Internet exchange on-site
Certifications & Compliance
βUptime Institute Tier IVβPCI DSSβISO 22301βHIPAAβSOC 2 Type II
Network Carriers
Representative of the carrier ecosystem typically available at this facility β confirm current carriers on-site with the operator.
SingTel
China Telecom Global
KT Corporation
Location
π‘ Nearby subsea cable infrastructure
This facility is approximately 91 km from the Batangas, Philippines cable landing point, which serves Asia America Gateway (AAG), TGN-IA. Proximity to a landing station can be a factor in latency and diversity planning β confirm specific connectivity with the facility operator.
View all landing points βMore from Teraco
TE
Teraco
Johannesburg, South Africa
Uptime Tier III
ISO 27001
SOC 2
TE
Teraco JB3 Johannesburg
Teraco
Johannesburg, South Africa
Uptime Tier IV
ISO 27001
SOC 2
TE
Teraco CT1 Cape Town
Teraco
Cape Town, South Africa
Uptime Tier III
ISO 27001
SOC 2